Mathematics, 23.03.2020 19:56 alesiabarrios6
AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When changing over from producing product B to A, there is no change over time. When changing over from producing product A to B, it takes 8 machine hours. If the previous day ended with producing product B, what is the effective capacity when AE Manufacturing has the following schedule: product A, product B, product A.
56 machine hours per day
60 machine hours per day
44 machine hours per day
52 machine hours per day
Answers: 3
Mathematics, 21.06.2019 13:00, geraldsmith2008
He expression 2(l + w) is used to calculate the perimeter of a rectangle, where l is length and w is width. if the length is fraction 2 over 3 unit and the width is fraction 1 over 3 unit, what is the perimeter of the rectangle in units? fraction 2 over 3 unit 1 unit 1fraction 2 over 3 units 2 units
Answers: 3
Mathematics, 21.06.2019 20:00, oofoofoof1
Fred has a spinner that is split into four equal sections: red, blue, green, and yellow. fred spun the spinner 688 times. which of the following would be a good estimate of the number of times the spinner lands on the green section? a. 269 b. 603 c. 344 d. 189
Answers: 1
AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When changi...
Mathematics, 27.07.2019 16:30