Mathematics, 23.03.2020 19:56 alesiabarrios6

AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When changing over from producing product B to A, there is no change over time. When changing over from producing product A to B, it takes 8 machine hours. If the previous day ended with producing product B, what is the effective capacity when AE Manufacturing has the following schedule: product A, product B, product A.

56 machine hours per day

60 machine hours per day

44 machine hours per day

52 machine hours per day

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, geraldsmith2008
He expression 2(l + w) is used to calculate the perimeter of a rectangle, where l is length and w is width. if the length is fraction 2 over 3 unit and the width is fraction 1 over 3 unit, what is the perimeter of the rectangle in units? fraction 2 over 3 unit 1 unit 1fraction 2 over 3 units 2 units
Answers: 3
image
Mathematics, 21.06.2019 20:00, oofoofoof1
Fred has a spinner that is split into four equal sections: red, blue, green, and yellow. fred spun the spinner 688 times. which of the following would be a good estimate of the number of times the spinner lands on the green section? a. 269 b. 603 c. 344 d. 189
Answers: 1
image
Mathematics, 21.06.2019 20:30, NeriyahY
Find the zeros of each function. f(x) = 6x^2 - 7x - 20
Answers: 1
image
Mathematics, 21.06.2019 20:40, anaruiz00
What are the values of each variable in the diagram below?
Answers: 2
You know the right answer?
AE Manufacturing has 60 machine hours every day. AE Manufacturing two products, A and B. When changi...

Questions in other subjects: