Mathematics, 21.03.2020 11:33 kkennethbrown9222
As explained in the Help section for the Workforce Compensation, Training, and Product Assembly decision screen, if (1) a company pays a drone PAT member an annual base wage of $22,000, an $800 year-end bonus for perfect attendance, and provides a company-paid annual fringe benefits package worth $3,200 and (2) a PAT is paid a $6 assembly quality incentive per UAV drone assembled that is equally divided among 4 PAT members.
Then if a drone PAT's productivity is 1500 drones per year:
a. the labor cost for a drone assembled at overtime would be $76.00.
b. the labor cost for a drone assembled at overtime would be $93.33.
c. the total compensation cost per drone assembled would be $77.07.
d. the labor cost for a drone assembled at overtime would be $85.07
e. the labor cost for a drone assembled at overtime would be $75.33.
Answers: 3
Mathematics, 21.06.2019 22:30, brooklynpage3930
The party planning committee has to determine the number of tables needed for an upcoming event. if a square table can fit 8 people and a round table can fit 6 people, the equation 150 = 8x + 6y represents the number of each type of table needed for 150 people.
Answers: 1
Mathematics, 21.06.2019 23:30, pennygillbert
The area (a) of a circle with a radius of r is given by the formula and its diameter (d) is given by d=2r. arrange the equations in the correct sequence to rewrite the formula for diameter in terms of the area of the circle.
Answers: 1
As explained in the Help section for the Workforce Compensation, Training, and Product Assembly deci...
History, 26.08.2019 05:00
Mathematics, 26.08.2019 05:00
Social Studies, 26.08.2019 05:00
Biology, 26.08.2019 05:00
Mathematics, 26.08.2019 05:00