subject
Mathematics, 20.03.2020 12:54 fermaluis8015

This is the last part I need work shown PELASE help me


This is the last part I need work shown PELASE help me

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, ezapata21
You are making a battery for a science project. you have copper wire for your first electrode. you need to choose a conductor, a second electrode, and a device to plug into your battery. you have already chosen a lemon conductor. complete each statement below about the options that include a lemon conductor.
Answers: 2
image
Mathematics, 21.06.2019 22:30, stodd9503
Aright triangle has an area of 21 m2. the dimensions of the triangle are increased by a scale factor of 4. what is the area of the new triangle
Answers: 3
image
Mathematics, 22.06.2019 02:30, sodiumvlogsYT
Acable company claims that the average household pays $78 a month for a basic cable plan, but it could differ by as much as $20. write an absolute value inequality to determine the range of basic cable plan costs with this cable company. a. |x − 78| ≥ 20 b. |x − 20| ≥ 78 c. |x − 20| ≤ 78 d. |x − 78| ≤ 20
Answers: 1
image
Mathematics, 22.06.2019 04:30, ashton3952525
The survey of study habits and attitudes (ssha) is a psychological test that measures the motivation, attitude toward school, and study habits of students, scores range from 0 to 200. the mean score for u. s. college students is about 115, and the standard deviation is about 30. a teacher who suspects that older students have better attitudes toward school gives the ssha to 55 students who are at least 30 years of age. the mean score is 113.2. assume the population standard deviation is 30 for older students what is the margin of error for a 95% confidence interval for the population mean score for a. older students? b. compute the 95% confidence interval for the population mean score for older students. c. compute the 99% confidence interval for the population mean score for older students. d. compute the 88% confidence interval for the population mean score for older students.
Answers: 3
You know the right answer?
This is the last part I need work shown PELASE help me
...

Questions in other subjects:

Konu
Mathematics, 12.02.2021 08:20