subject
Mathematics, 11.03.2020 18:27 joejoefofana

The U. S. Census Bureau conducts a study to determine the time needed to complete the short form. The Bureau surveys 200 people. The sample mean is 8.2 minutes. There is a known standard deviation of 2.2 minutes. The population distribution is assumed to be normal. Construct a 90% confidence interval for the population mean time to complete the forms. State the confidence interval, sketch the graph, and calculate the error bound.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, GL1TCHED
What is the average diastolic blood pressure for adults
Answers: 2
image
Mathematics, 21.06.2019 20:00, kait93
Elizabeth is using a sample to study american alligators. she plots the lengths of their tails against their total lengths to find the relationship between the two attributes. which point is an outlier in this data set?
Answers: 1
image
Mathematics, 22.06.2019 01:00, toribrown3773
Francis is getting new carpet tiles in his living room and den. his living room and den are connected. he needs to figure out how much carpet he needs and the cost involved. if each tile costs $2.00 per sq ft, how much would it cost to have new tile put in the den? a) $24 b) $36 c) $48 d) $54 plz awnser soon
Answers: 3
image
Mathematics, 22.06.2019 02:30, fr996060
(2, 4) (2, 1) (6, 12) (4, -5) (-2, 4) |(2, -4) (6, -12) (-4,5) quadrilateral abcd is reflected over the x-axis. quadrilateral abcd is translated 2 units right and 1 unit down. quadrilateral abcd is dilated by a scale factor of 3. quadrilateral abcd is rotated 180° clockwise about the origin. reset next
Answers: 3
You know the right answer?
The U. S. Census Bureau conducts a study to determine the time needed to complete the short form. Th...

Questions in other subjects:

Konu
Mathematics, 31.08.2019 00:30
Konu
Mathematics, 31.08.2019 00:30