subject
Mathematics, 10.03.2020 08:13 southchrista3

You time someone completing a single task the first time at 100 minutes and the fourth time they do the task it takes 81 minutes. You should use a 90 percent learning curve to estimate the length of time this worker will take to complete this task in the future.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, AnaiyaKirksey8
Find the area of a trapezoid with bases 14 cm and 18 cm and height 10 cm. 160 cm2 140 cm2 180 cm2 126 cm2
Answers: 3
image
Mathematics, 21.06.2019 17:00, marleas
Bugs bunny was 33 meters below ground, digging his way toward pismo beach, when he realized he wanted to be above ground. he turned and dug through the dirt diagonally for 80 meters until he was above ground
Answers: 3
image
Mathematics, 21.06.2019 20:00, dathanboyd
Cody started biking to the park traveling 15 mph, after some time the bike got a flat so cody walked the rest of the way, traveling 4 mph. if the total trip to the park took 6 hours and it was 46 miles away, how long did cody travel at each speed? solve using rate times time= distance
Answers: 1
image
Mathematics, 21.06.2019 22:10, BreadOfTheBear
Use the spider tool located on page 1 of this activity to draw a 12-pointed star for the new logo. (hint: if the spider rotates 360 degrees -- or 720 degrees or 1080 degrees -- she will be facing in the same direction in which she started. when the spider is done drawing, you want her to be facing in the same direction in which she started. she'll be making 12 rotations, all the same size, so each rotation must be some multiple of 360/12 = 30 degrees.) urgently. been stuck on this problem for around 45 minutes now.! it should be easy if you're smart enough
Answers: 3
You know the right answer?
You time someone completing a single task the first time at 100 minutes and the fourth time they do...

Questions in other subjects:

Konu
Engineering, 18.07.2019 02:30