subject
Mathematics, 10.03.2020 08:10 Eric0393nsuh

We wish to study the quality of our production line. We take a random sample of 1000 widgets from our line. A quality rating was determined for each of the 1000 widgets, and the average quality rating in the sample was 4. The sample standard deviation was 0.5. Also, 6 of the 1000 widgets were found to be defective.

Estimate the average quality rating for widgets from our production line, and include the uncertainty in this estimate in the form, a ± b.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, chmereaustin1
An empty bucket is placed under a faucet dripping at a constant rate of 4 milliliters per minute. with the given information, which of these statements is a reasonable conclusion? a there will be 24 milliliters of water in the bucket after 16 hour. b there will be 60 milliliters of water in the bucket after 14 hour. c there will be 160 milliliters of water in the bucket after 20 minutes. d there will be 100 milliliters of water in the bucket after 40 minutes.
Answers: 1
image
Mathematics, 21.06.2019 19:40, lylah42
The krasnapolski is a top-of-the-line hotel in amsterdam, the netherlands. among their many services, they rent bicycles to guests. the bicycle checkout is open 24 hours per day 7 days per week and has 50 bicycles on hand. on average, 10 guests request a bicycle each day, arriving completely randomly at all times of the day during the spring and summer seasons. guests keep bicycles for four days on average, with a standard deviation of two days. how long does a guest on average have to wait for a bike? a. approximately 24 hours b. approximately 0.033 hours c. approximately 4 days d. approximately 47 minutes
Answers: 3
image
Mathematics, 21.06.2019 20:30, nathanscastr02
The graph of y x3 is translated so that the point (1. 1) is moved to (1, 4). what is the equation of the new graph?
Answers: 1
image
Mathematics, 21.06.2019 21:00, annikafischer
Askateboard ramp is in the shape of a right triangle what is the height of the ramp
Answers: 3
You know the right answer?
We wish to study the quality of our production line. We take a random sample of 1000 widgets from ou...

Questions in other subjects:

Konu
English, 30.04.2021 04:10
Konu
Mathematics, 30.04.2021 04:10
Konu
Mathematics, 30.04.2021 04:10