subject
Mathematics, 09.03.2020 03:56 isa5166

A person can do a job in 6 days. Another can do the same job in 4 days. If they work together, how long do they need to finish the job?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:30, yeetmaster7688
Find the value of x for which line a is parallel to line b
Answers: 1
image
Mathematics, 21.06.2019 23:20, savannahvargas512
For which pairs of functions is (f•g)(x)=12x? f(x)=3-4x and g(x)=16x-3 f(x)=6x2 and g(x)= 2/x f(x)= and g(x) = 144x f(x)=4x and g(x) =3x
Answers: 1
image
Mathematics, 22.06.2019 03:30, waterborn7152
The length of a rectangular board is 3 feet less than twice its width. a second rectangular board is such that each of its dimensions is the reciprocal of the corresponding dimensions of the first rectangular board. if the perimeter of the second board is one-fifth the perimeter of the first, what is the perimeter of the first rectangular board?
Answers: 1
image
Mathematics, 22.06.2019 05:30, Vlop2780
Solve this problem by using a 5d process or writing and solving an equation. no matter which method you use, be sure to define your variable and write an equation to represent the relationship a rectangle has a perimeter of 30 inches. its length is one less than three times its width what are the length and wodyh of the rectangle?
Answers: 2
You know the right answer?
A person can do a job in 6 days. Another can do the same job in 4 days. If they work together, how l...

Questions in other subjects:

Konu
Mathematics, 02.09.2020 20:01
Konu
Mathematics, 02.09.2020 21:01