The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the optimum sequence (first car to last)?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, kaelyynn752
Iwill give brainliest only if your correct the words subsequent and submerge both contain the prefix sub. based on this information, what does the prefix sub most likely mean? a) under or secondary b) true or verifiable c) tricky or difficult d) around or centered on
Answers: 1
image
Mathematics, 21.06.2019 19:30, aljdones
At the beginning of 1974/75,2 years a man invested #2000 in a bank at 12.5% compound interest, if it degree #650 at the end of each two years to pay his son's school fees, after payment of interest to pay his son's school fees, how much did he have left at the beginning of the 1978/79 school year?
Answers: 3
image
Mathematics, 21.06.2019 20:00, rosaura15
If the discriminant if a quadratic equation is 4 which statement describes the roots?
Answers: 3
image
Mathematics, 21.06.2019 22:30, winterblanco
How do you do the foil method with polynomials?
Answers: 1
You know the right answer?
The operations manager of a body and paint shop has five cars to schedule for repair. He would like...