subject
Mathematics, 05.03.2020 22:37 Jasten

This exercise illustrates that poor quality can affect schedules and costs. A manufacturing process has 100 customer orders to fill. Each order requires one component part that is purchased froma supplier. However, typically, 2% of the components are identifiedas defective, and the components can be assumed to beindependent. a)If the manufacturer stocks 100 components, what is theprobability that the 100 orders can be filled without reorderingcomponents?b) If the manufacturer stocks 102 components, what is theprobability that the 100 orders can be filled without reorderingcomponents?c) If the manufacturer stocks 105 components, what is theprobability that the 100 orders can be filled without reorderingcomponents?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, sophiawatson70
Line gh passes through points (2, 5) and (6, 9). which equation represents line gh? y = x + 3 y = x – 3 y = 3x + 3 y = 3x – 3
Answers: 1
image
Mathematics, 21.06.2019 22:00, gamallopatty
If i had 1234 apples and 1 banana what is the total amount
Answers: 2
image
Mathematics, 22.06.2019 00:00, ella3714
The base of a rectangular pyramid is 13 inches long and 12 inches wide. the height of the pyramid is 8 inches. what is the volume of the pyramid
Answers: 3
image
Mathematics, 22.06.2019 00:30, tubbs45
Carl is hanging pictures in his home. there is a space on a wall that has a width of 4 feet. carl has pictures with different widths. which picture width would fit in the space on the wall? a. 46 inches b. 60 inches c. 50 inches d. 54 inches
Answers: 1
You know the right answer?
This exercise illustrates that poor quality can affect schedules and costs. A manufacturing process...

Questions in other subjects:

Konu
Mathematics, 05.11.2019 23:31