subject
Mathematics, 03.03.2020 18:50 jonestmoney381

The Toylot company makes an electric train with a motor that it claims will draw an average of only 0.8 ampere (A) under a normal load. A sample of eleven motors was tested, and it was found that the mean current was x = 1.20 A, with a sample standard deviation of s = 0.42 A. Do the data indicate that the Toylot claim of 0.8 A is too low? (Use a 1% level of significance.)

What is the value of the sample test statistic?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:40, friendsalwaysbae
Given the sequence 7, 14, 28, 56, which expression shown would give the tenth term? a. 7^10 b. 7·2^10 c. 7·2^9
Answers: 1
image
Mathematics, 21.06.2019 22:30, thelonewolf5020
Amachine that produces a special type of transistor (a component of computers) has a 2% defective rate. the production is considered a random process where each transistor is independent of the others. (a) what is the probability that the 10th transistor produced is the first with a defect? (b) what is the probability that the machine produces no defective transistors in a batch of 100? (c) on average, how many transistors would you expect to be produced before the first with a defect? what is the standard deviation? (d) another machine that also produces transistors has a 5% defective rate where each transistor is produced independent of the others. on average how many transistors would you expect to be produced with this machine before the first with a defect? what is the standard deviation? (e) based on your answers to parts (c) and (d), how does increasing the probability of an event a↵ect the mean and standard deviation of the wait time until success?
Answers: 3
image
Mathematics, 21.06.2019 23:30, eileentennyson
I’m really confused and need to learn this
Answers: 1
image
Mathematics, 21.06.2019 23:30, jtroutt74
Afactory buys 10% of its components from suppliers b and the rest from supplier c. it is known that 6% of the components it buys are faulty. of the components brought from suppliers a,9% are faulty and of the components bought from suppliers b, 3% are faulty. find the percentage of components bought from supplier c that are faulty.
Answers: 1
You know the right answer?
The Toylot company makes an electric train with a motor that it claims will draw an average of only...

Questions in other subjects:

Konu
Mathematics, 20.03.2021 01:40
Konu
Mathematics, 20.03.2021 01:40