subject
Mathematics, 26.02.2020 11:48 Zacwn6360

A construction worker worked 36 hours and earned $504 which included some compensation for paid time off. If his true hourly wage is $4 per hour more than the pay rate shown on his pay stub, what rate is shown on his pay stub?
Hint: the true hourly wage is the earnings on the pay stub divided by the hours worked


A construction worker worked 36 hours and earned $504 which included some compensation for paid time

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:30, baileyanne9389
If an athlete can bike 6 miles in 25 minutes, how many miles will he bike in an hour and half if he continues to bike at the same rate?
Answers: 2
image
Mathematics, 21.06.2019 15:00, recannon02
Acircular hot tub located near the middle of a rectangular patio has a diameter of 48 inches. the patio measures 11 feet by 6 feet. what is the area of the patio that is not covered by the hot tub?
Answers: 1
image
Mathematics, 21.06.2019 15:00, bige556
Cherie measures and records the lengths and sizes of the same style of a sandal found at a shoe store. which equation can be used to determine the approximate shoe size, s, for a foot length of x inches? s = x – 2 s = 2x – 10 s = x + 6 s = 2x + 4
Answers: 3
image
Mathematics, 21.06.2019 17:30, 5001Je
Give the equations of two different lines that are perpendicular to the line 3x + 4y = 7.
Answers: 1
You know the right answer?
A construction worker worked 36 hours and earned $504 which included some compensation for paid time...

Questions in other subjects:

Konu
Mathematics, 17.02.2021 21:40