Five jobs are waiting to be run. Their expected run times are 9, 6, 3, 5, and X. In what order should they be run to minimize average response time? (Your answer will depend on X.)

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, amir6658
Arestaurant gives out a scratch-off card to every customer. the probability that a customer will win a prize from a scratch-off card is 25%. design and conduct a simulation using random numbers to find the experimental probability that a customer will need more than 3 cards in order to win a prize. justify the model for your simulation, and conduct at least 10 trials.
Answers: 1
image
Mathematics, 21.06.2019 18:00, keasiabrown25
Determine the difference: 3.2 × 1010 – 1.1 × 1010. write your answer in scientific notation.
Answers: 1
image
Mathematics, 21.06.2019 20:30, shonesam98
Apinhole camera is made out of a light-tight box with a piece of film attached to one side and pinhole on the opposite side. the optimum diameter d(in millimeters) of the pinhole can be modeled by d=1.9[ (5.5 x 10^-4) l) ] ^1/2, where l is the length of the camera box (in millimeters). what is the optimum diameter for a pinhole camera if the camera box has a length of 10 centimeters
Answers: 1
image
Mathematics, 21.06.2019 21:00, mscharris66
Simplify. 4+3/7x-2-2/7x a. 2-5/7x b. 6-1/7x c. 2+1/7x d. 6+5/7x
Answers: 1
You know the right answer?
Five jobs are waiting to be run. Their expected run times are 9, 6, 3, 5, and X. In what order shoul...

Questions in other subjects: