subject
Mathematics, 25.02.2020 19:25 colexie7410

Consider this population data set: 4.6, 7, 11, 12, 18, 26, 23, 14, 31, 22, and 12. The values 11. 31, 22, and 12 constitute a random sample drawn
from the data set.
The sample mean is more than the population mean by

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, lulustar13
(! ) three cylinders have a height of 8 cm. cylinder 1 has a radius of 1 cm. cylinder 2 has a radius of 2 cm. cylinder 3 has a radius of 3 cm. find the volume of each cylinder
Answers: 1
image
Mathematics, 21.06.2019 20:30, Travisbennington
Three numbers x, y, and z are in the ratio 2: 7: 8. if 12 is subtracted from y, then three numbers form a geometric sequence (in the order x, y–12, z). find x, y, and z. there are 2 sets.
Answers: 1
image
Mathematics, 21.06.2019 21:00, cwebb4383
The sum of the first eight terms of an arithmetic progression is 9m + 14. the fifth term of the06 progression is 2m - 6, where m is a constant. given that the first term of the progression is 26,find the value of the common difference, d and thevalue of m.
Answers: 1
image
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Consider this population data set: 4.6, 7, 11, 12, 18, 26, 23, 14, 31, 22, and 12. The values 11. 31...

Questions in other subjects: