Mathematics, 24.02.2020 16:36 meth77
In the manufacturing of a chemical adhesive, 9% of all batches have raw materials from two different lots. This occurs when holding tanks are replenished and the remaining portion of a lot is insufficient to fill the tanks. Only 5% of batches with material from a single lot require reprocessing. However, the viscosity of batches consisting of two or more lots of material is more difficult to control, and 40% of such batches require additional processing to achieve the required viscosity. Let A denote the event that a batch is formed from two different lots, and let B denote the event that a lot requires additional processing. Determine the following probabilities.
a. P(A)
b. P(A')
c. P(B\A)
d. P(B\A')
e. P(A ∩ B)
f. P(A ∩ B')
g. P(B)
Answers: 2
Mathematics, 21.06.2019 17:30, lizzie3545
Jabari is power washing houses for a summer job. for every job, he charges an initial fee plus $30 for each hour of work. his total fee for a 4 -hour job, for instance, is $170 . jabari's total fee, f, for a single job is a function of the number, t, of hours it takes him to complete the job. write the function's formula.
Answers: 2
Mathematics, 21.06.2019 19:40, NobleWho
Neoli is a nurse who works each day from 8: 00 am to 4: 00 pm at the blood collection centre. she takes 45 minutes for her lunch break. on average, it takes neoli 15 minutes to collect each sample and record the patient's details. on average, how many patients can neoli see each day?
Answers: 3
In the manufacturing of a chemical adhesive, 9% of all batches have raw materials from two different...
Mathematics, 27.09.2019 08:20
Social Studies, 27.09.2019 08:20
Biology, 27.09.2019 08:20
Health, 27.09.2019 08:20
Mathematics, 27.09.2019 08:20
Mathematics, 27.09.2019 08:20