subject
Mathematics, 24.02.2020 04:54 sjsmith21

Using Measures of Center and Variability to Compare Data Quiz - Level G
Azul performed an experiment to determine which crank-powered radio works best. He
cranked 15 randomly selected radios of each brand 30 times at the same speed and measured
how long the radios played in minutes before running out of power. The results of the
experiment are displayed in the box plots below.
What is most likely true about the play times of these two crank radio
brands after 30 cranks?
Arus Crank Radio Experiment Results
Secure Hike Emergency Radio 4.0 (minutes):
21, 22, 24, 25, 25, 25, 25, 26, 27, 29, 30,
30, 30, 30, 33
X-Treamline Crank Radio (minutes):
25, 25, 27, 27, 28, 29, 30, 30, 30, 34, 36,
36, 38, 39, 42
Click to Zoom
25% of X-Treamline Crank Radios ARE
LIKELY to play 30 minutes or longer, while
0% of Secure Hike Emergency Radios ARE
LIKELY to play 30 minutes or longer.
75% of X-Treamline Crank Radios ARE
LIKELY to play 30 minutes or longer, while
only 50% of Secure Hike Emergency Radios
ARE LIKELY to play 30 minutes or longer.
50% of X-Treamline Crank Radios ARE
LIKELY to play 30 minutes or longer, while
only 25% of Secure Hike Emergency Rodios
ARE LIKELY to play 30 minutes or longer.
100% of X-Treamline Crank Radios ARE
LIKELY to play 30 minutes or longer, while
only 25% of Secure Hike Emergency Radios
ARE LIKELY to play 30 minutes or longer.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, jenesis8
Ineed ! the person who answers and shows their work on they got the answer first will be marked the !
Answers: 1
image
Mathematics, 21.06.2019 19:00, loravillanueva87
Rena is building a 1: 180 scale model of a real castle. her model has a rectangular base that is 3 feet wide and 4 feet long what is the area of the base of the actual castle in square feet
Answers: 2
image
Mathematics, 21.06.2019 20:20, Kelbee781
Each person in an it department of 25 people works on at least one of 3 major projects: system security, program implementation, platform development. 10 people work on system security, 13 work on program implementation, and 12 work on platform development. 4 people work on system security and platform development, 5 people work on program implementation and platform development, and 2 people work on all three projects. how many people work on system security and program implementation?
Answers: 1
image
Mathematics, 22.06.2019 00:00, queenkimm26
Solve 4 ln x=2ln25 a) x=5 b) x=25 c) x=625
Answers: 1
You know the right answer?
Using Measures of Center and Variability to Compare Data Quiz - Level G
Azul performed an expe...

Questions in other subjects:

Konu
Mathematics, 28.02.2021 07:20