subject
Mathematics, 23.02.2020 21:54 kaziyahf2006

A person can do a job in 6 days. Another can do the same job in 4 days. If they work together, how long do they need to finish the job?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, deadslinger5134
Which product is positive a is 2/5 -8/9 -1/3 -2/7 b is -2/5 8/9 -1/3 -2/7 c is 2/5 8/9 1/3 -2/7 d is -2/5 -8/9 1/3 2/7
Answers: 2
image
Mathematics, 21.06.2019 17:30, 21villalobosjabez
Trent wants to buy 2 packs of trading cards for 3 dollars each. the trading card packs that trent normally buys tend to come in packs of 6, 10, 12, or 15 cards. after selecting 2 packs, trent found that the first pack of cards cost 25 cents per card, and the second pack cost 30 cents per card. trent uses this information to write the equations below in order to compare c, the number of cards in each pack.
Answers: 2
image
Mathematics, 21.06.2019 18:30, daniel1480
Given: m∠ adb = m∠cdb ad ≅ dc prove: m∠ bac = m∠bca lol
Answers: 2
image
Mathematics, 21.06.2019 23:30, onepunchman20
What is the volume of a rectangular crate that has dimensions 9 inches by 9 inches by 1 feet? 1,458 in.3 121.5 in.3 1,012.5 in.3 36 in.3
Answers: 1
You know the right answer?
A person can do a job in 6 days. Another can do the same job in 4 days. If they work together, how l...

Questions in other subjects:

Konu
Mathematics, 10.01.2020 02:31