subject
Mathematics, 21.02.2020 19:45 samaragreen34

(30 pts) The total construction cost of a sewage treatment plant with a capacity of 50 million gallons per day completed 2013 in Wichita, Kansas was $6.5 million. It was proposed that a similar treatment plant with a capacity of 80 million gallons per day be built in Los Angles, California, for completion in 2020. For the additional information given below, perform an order of magnitude estimate of the cost of the proposed plant using the following steps in order (a) to (f): a. In the total construction cost for the Wichita, Kansas plant, there was an item of $0.5 million for site preparation which is not typical for similar plants. b. The variation of sizes of the refineries can be approximated by the cost-capacity factor with m

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, kassidyopry15
The table shows the distance traveled over time while traveling at a constant speed.
Answers: 1
image
Mathematics, 21.06.2019 15:10, morganmsaylor1365
Point a is located at (0, 4), and point c is located at (−3, 5). find the x value for the point b that is located one fourth the distance from point a to point c. −0.25 −0.5 −0.75 −1
Answers: 1
image
Mathematics, 21.06.2019 22:30, alonnachambon
Factor the polynomial by its greatest common monomial factor.
Answers: 1
image
Mathematics, 22.06.2019 00:30, ERIKALYNN092502
The scatter plot shows the number of animal cells clara examined in a laboratory in different months: plot ordered pairs 1, 20 and 2, 60 and 3,100 and 4, 140 and 5, 180 what is the approximate predicted number of animal cells clara examined in the 9th month?
Answers: 3
You know the right answer?
(30 pts) The total construction cost of a sewage treatment plant with a capacity of 50 million gallo...

Questions in other subjects:

Konu
English, 07.09.2019 01:10
Konu
English, 07.09.2019 01:10
Konu
Mathematics, 07.09.2019 01:10
Konu
Mathematics, 07.09.2019 01:10
Konu
Physics, 07.09.2019 01:10