subject
Mathematics, 21.02.2020 16:20 ag1606

The production department of Celltronics International wants to explore the relationship between the number of employees who assemble a subassembly and the number produced. As an experiment, 2 employees were assigned to assemble the subassemblies. They produced 15 during a one-hour period. Then 4 employees assembled them. They produced 25 during a one-hour period. The complete set of paired observations follows.

Number of Assemblers One Hour of Production (units)
2 15
4 25
1 10
5 40
3 30
The dependent variable is production; that is, it is assumed that different levels of production result from a different number of employees.

(a) Draw a scatter diagram.

(b) Based on the scatter diagram, does there appear to be any relationship between the number of assemblers and production? Explain.

(c) Compute the correlation coefficient.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, aidengalvin20
Plz i beg u asap ! what is the equation of this graphed line? enter your answer in slope-intercept form in the box.
Answers: 2
image
Mathematics, 21.06.2019 21:00, ijohnh14
Suppose a gym membership has an initial enrollment fee of $75 and then a fee of $29 a month. which equation models the cost, c, of the gym membership for m months?
Answers: 1
image
Mathematics, 22.06.2019 02:30, DojaCat
F(x) = 2x + 1? h(x) = x – h(x) = x + h(x) = x – 2 h(x) = x + 2
Answers: 2
image
Mathematics, 22.06.2019 08:00, Jasten
3. is it possible to solve x (t ) for t, substitute it into y(t) to eliminate the parameter, t, and write it as a rectangular equation with x and y instead? why or why not? these are the equations i am working with: •x (t)=0.0411905(t^2)+(-0.164619)t+28. 0114 and • y (t)=-0.024127(t^2)+(-0.591143)t+(-8 7.4403)
Answers: 2
You know the right answer?
The production department of Celltronics International wants to explore the relationship between the...

Questions in other subjects:

Konu
English, 23.11.2019 09:31