Mathematics, 20.02.2020 03:38 AM28
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? Round answers to 1 decimal place. Minimum cycle time minutes/unit Maximum cycle time minutes/unit b. What range of daily output is theoretically possible for the line? Round answers to 1 decimal place. Enter the lower end of the range in the left (first) box and upper end of the range in the right (second) box. Range of output to units/day c. What is the minimum number of workstations needed if the maximum output rate is needed? Round answer based on information provided in lecture. Minimum number of workstations d. What cycle time will provide an output rate of 125 units per day? Round answer to 1 decimal place. Cycle time min/unit e. What output should result if the cycle time is (1) 9 minutes? (2) 15 minutes? Round answer to whole number. Cycle Time Potential Output (1) units/day (2) units/day
Answers: 2
Mathematics, 21.06.2019 15:00, haleylayne74
What is the compound interest in a three-year, $100,000 loan at a 10 percent annual interest rate a) 10.00 b) 21.00 c) 33.10 d) 46.41
Answers: 1
Mathematics, 21.06.2019 23:10, ammarsico19
Tom travels between the two mile markers shown and then finds his average speed in miles per hour. select the three equations that represent this situation.
Answers: 1
Mathematics, 22.06.2019 01:50, vorhees2406
If jklm is a trapezoid, which statements must be true?
Answers: 1
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total tim...
Mathematics, 10.11.2020 17:40
Business, 10.11.2020 17:40
Biology, 10.11.2020 17:40
Physics, 10.11.2020 17:40
Biology, 10.11.2020 17:40
Mathematics, 10.11.2020 17:40