Mathematics, 19.02.2020 04:31 meganwintergirl
A quality control engineer at a potato chip company tests the bag filling machine by weighing bags of potato chips. Not every bag contains exactly the same weight. But if more than 15% of bags are over-filled then they stop production to fix the machine.
They define over-filled to be more than 1 ounce above the weight on the package. The engineer weighs 100 bags and finds that 21 of them are over-filled.
He plans to test the hypotheses: H0: p = 0.15 versus Ha: p > 0.15 (where p is the true proportion of overfilled bags).
What is the test statistic?
Z = 1.68
Z = -1.68
Z = 4
Z = -1.47
Answers: 3
Mathematics, 21.06.2019 13:30, castiaulii16
Phillip had some bricks. he stacked them in 6 equal piles. which expression shows the number of bricks phillip put in each pile? let the variable m stand for the unknown number of bricks. m + 6 m÷6 m−6 6m
Answers: 3
A quality control engineer at a potato chip company tests the bag filling machine by weighing bags o...
Mathematics, 28.02.2020 22:45
Computers and Technology, 28.02.2020 22:45