A work crew spent four days paving a stretch of road. The table below shows
the length of road paved each day.
ROAD PAVING
Day
Length (miles)
Monday 5.5/6

Tuesday 6.3/6
Wednesday 8.4/6
Thursday 4.1/6

The entire length of the road will be 27 miles. What is the total remaining
length of road that needs to be paved after the four days?
Show your work.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, Rperez6491
The number of revolutions of two pulleys is inversely proportional to their diameters. if a 24-inch diameter pulley making 400 revolutions per minute is belted to an 8-inch diameter pulley, find the number of revolutions per minute of the smaller pulley.
Answers: 1
image
Mathematics, 21.06.2019 16:00, goodygoodgirlygirl
If the measure of angle 1 is 110 degrees and the measure of angle 3 is (2 x+10 degree), what is the value of x?
Answers: 2
image
Mathematics, 21.06.2019 16:00, sebastianapolo5
Asalesperson earns $320 per week plus 8% of her weekly sales. the expression representing her earnings is 320 + 0.08x. which of the following describes the sales necessary for the salesperson to earn at least $1000 in the one week?
Answers: 2
image
Mathematics, 21.06.2019 17:00, etuck16
Find an equation for the linear function which has slope -10 and x-intercept -7
Answers: 1
You know the right answer?
A work crew spent four days paving a stretch of road. The table below shows
the length of road...

Questions in other subjects:

Konu
Mathematics, 28.02.2021 14:00
Konu
Mathematics, 28.02.2021 14:00