subject
Mathematics, 15.02.2020 05:07 saucyboyFredo

The starting work part costs $2.25 in a batch production operation. Batch quantity = 100 parts. Each cycle, part handling time = 0.50 min, and operation time = 1.67 min. Setup time = 50 min. Equipment cost rate = $35.00/hr, and labor cost rate = $18.00/hr, including overhead costs. There is no tool change or tool cost in the operation. The machine tool is 100% reliable, and the scrap rate = 5%. Determine the number of hours required to complete the batch."

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, hellicuh
Linet passes through (4.5) and is perpendicular to the line shown on the condirate grid. what is the equation of line t in standard form?
Answers: 1
image
Mathematics, 21.06.2019 15:40, tylorroundy
Given the following sampling distribution of one mean with a sample size 49, from a normally distributed population, find the population standard deviation, o.79828588912497
Answers: 3
image
Mathematics, 21.06.2019 19:00, kaylanweston
Could someone with number 1 and 2
Answers: 1
image
Mathematics, 21.06.2019 19:30, kellynadine02
Evaluate the expression. (9 + 5)(3 + 2)0
Answers: 2
You know the right answer?
The starting work part costs $2.25 in a batch production operation. Batch quantity = 100 parts. Each...

Questions in other subjects:

Konu
Social Studies, 03.04.2020 18:25