subject
Mathematics, 15.02.2020 02:27 averycipher

Base course aggregate has a target dry density of 119.7 pcf in place. It will be laid down and compacted in a rectangular street repair area of 2,000 ft. x 48 ft. x 6 in. The aggregate in the stockpile contains 3.1 percent moisture. If the required compaction is 95 percent of the target, how many tons of aggregate will be needed? Note: answer in terms of tons of both dry and moist base material assuming no loss or drying out of the aggregate onsite.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, nataliahenderso
Which interval for the graphed function contains the local maximum? [–3, –2] [–2, 0] [0, 2] [2, 4]
Answers: 2
image
Mathematics, 21.06.2019 19:20, maisieisdabomb23
What is the measure of ac? 5 units 13 units 26 units 39 units 3x- 2b 6x + 9
Answers: 2
image
Mathematics, 21.06.2019 21:40, melinalange48
What is the value of x in the equation 1.5x+4-3=4.5(x-2)?
Answers: 2
image
Mathematics, 22.06.2019 00:30, alyssaanniebug
What is the slope of any line parallel to the line 8x+9y=3 in the standard (x, y) coordinate plane?
Answers: 1
You know the right answer?
Base course aggregate has a target dry density of 119.7 pcf in place. It will be laid down and compa...

Questions in other subjects: