subject
Mathematics, 12.02.2020 00:51 hdjsjfjruejchhehd

A leaky 10-kg bucket is lifted from the ground to a height of 14 m at a constant speed with a rope that weighs 0.5 kg/m. Initially the bucket contains 42 kg of water, but the water leaks at a constant rate and finishes draining just as the bucket reaches the 14-m level. Find the work done. (Use 9.8 m/s2 for g.) Show how to approximate the required work by a Riemann sum. (Enter xi* as xi.) Express the work as an integral. Evaluate the integral. (Round your answer to the nearest integer in Joules.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 23:20, ramireztony741
Write the equations in logarithmic form 7^3=343
Answers: 1
image
Mathematics, 22.06.2019 04:30, mvazquez298
If f(x)=x^2- 4 and g(x)=x^2 plus 2 x, (c) (f-/3) = ? (simplify your answer.)
Answers: 1
image
Mathematics, 22.06.2019 06:00, bubbleslol4463
When you divide a fraction less than 1 by a whole number greater than 1 is the quotient less than, greater than, or equal to the dividend?
Answers: 1
image
Mathematics, 22.06.2019 06:40, BreBreDoeCCx
Your baking cupcakes for the school dance, your recipe makes 24 cupcakes and needs 2 cups of milk. you need to make 288 cupcakes, how many quarts of milk will you need?
Answers: 2
You know the right answer?
A leaky 10-kg bucket is lifted from the ground to a height of 14 m at a constant speed with a rope t...

Questions in other subjects: