subject
Mathematics, 11.02.2020 20:48 abby4902

Future production requirements in the turret lathe department must be satisfied through the acquisition of several new machines and the hiring of new operators, the exact number to be determined. There are three new parts that will be produced. Part A has annual quantities of 20,000 units; part B, 32,000 units; and part C, 47,000 units. Corresponding standard times for these parts are 7.3 min, 4.9 min, and 8.4 min, respectively. The department will operate one 8-hour shift for 250 days/yr. The machines are expected to be 98% reliable, and the anticipated scrap rate is 4%. Worker efficiency is expected to be 100%. How many new turret lathes and operators are required to meet these production requirements?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, Kingoftycoons3271
Your client has saved $1,860 for a down payment on a house. a government loan program requires a down payment equal to 3% of the loan amount. what is the largest loan amount that your client could receive with this program
Answers: 3
image
Mathematics, 21.06.2019 19:30, woodfordmaliky
Louis wants to carpet the rectangular floor of his basement. the basement has an area of 864 square feet. the width of the basement is 2/3 it's length. what is the length of louis's basement
Answers: 1
image
Mathematics, 21.06.2019 20:40, anaruiz00
What are the values of each variable in the diagram below?
Answers: 2
image
Mathematics, 21.06.2019 21:30, foreverandalways80
Joanie wrote a letter that was 1 1/4 pages long. katie wrote a letter that was 3/4 page shorter then joagies letter. how long was katies letter
Answers: 1
You know the right answer?
Future production requirements in the turret lathe department must be satisfied through the acquisit...

Questions in other subjects:

Konu
Mathematics, 12.02.2022 22:30