subject
Mathematics, 11.02.2020 19:47 mariaramirez013

The cable is being used to lift a 2lb leaky bucket that is initially filled with 30 lb of water. When the bucket reaches the top of the building, it only has 5 lb of water left in it. If the cable was being pulled up at a constant rate of speed, how much work is done?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:40, madisongibson62
What is the distance between the points (2 -3) and (-6 4) on the coordinate plane
Answers: 1
image
Mathematics, 21.06.2019 19:00, ayeofaygo5168
Witch represents the inverse of the function f(x)=1/4x-12
Answers: 1
image
Mathematics, 21.06.2019 19:00, daisyperez1
1) what is the measure of the exterior angle, ∠uvw ? 2) in triangle man, what is the measure of the exterior angle at n (in degrees)?
Answers: 1
image
Mathematics, 21.06.2019 21:20, ladawnrowles005
Drag each expression to the correct location on the solution. not all expressions will be used. consider the polynomial 8x + 2x2 - 20x - 5. factor by grouping to write the polynomial in factored form.
Answers: 1
You know the right answer?
The cable is being used to lift a 2lb leaky bucket that is initially filled with 30 lb of water. Whe...

Questions in other subjects:

Konu
Mathematics, 26.02.2021 20:10