subject
Mathematics, 11.10.2019 22:00 sdolina5

An ordered pair of the function d(t) = 35t is

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:20, corbinfisher
The school track has eight lanes. each lane is 1.25 meters wide. the arc at each end of the track is 180. the distance of the home straight and the radii for the arcs in the 1st 4 lanes are given. s=85m r1=36.5m r2=37.75m r3=39m r4=40.25m part one: find the radii of lanes 5 through 8 of the track. show your work. part two: if max ran around lane one, how far did he run? show your work and explain your solution. part three: max wants to run a total of three laps around the track, choose two additional lanes (2-8) for him to run and find the distance around those two lanes. show your work and round to the hundredths. part 4: based on your lane choices in part three, what was the total distance max ran in the three laps around the track?
Answers: 2
image
Mathematics, 22.06.2019 05:20, samariahopkins4
Customers are used to evaluate preliminary product designs. in the past, 93% of highly successful products received good reviews, 51% of moderately successful products received good reviews, and 14% of poor products received good reviews. in addition, 40% of products have been highly successful, 35% have been moderately successful and 25% have been poor products. round your answers to four decimal places (e. g. 98.) what is the probability that a product attains a good review? (b) if a new design attains a good review, what is the probability that it will be a highly successful product? (c) if a product does not attain a good review, what is the probability that it will be a highly successful product?
Answers: 1
image
Mathematics, 22.06.2019 08:30, amy290
Which equation(s) have x = –3 as the solution? log3(2x + 15) = 2 log5(8x + 9) = 2 log4(–20x + 4) = 3 logx81 = 4
Answers: 1
image
Mathematics, 22.06.2019 10:20, calmicaela12s
Amanager measured the number of goods,  y, that his company produced in  x  hours. the company produces goods at a rate of  5  per hour. at hour  9,  the company had produced  45  goods. which equation, in point-slope form, correctly represents the goods produced by the company after  x  hours? a. y−45=5(x+9)b. y−45=5(x−9)c. y+9=5(x+45)d. y−9=5(x−45)
Answers: 2
You know the right answer?
An ordered pair of the function d(t) = 35t is...

Questions in other subjects:

Konu
Mathematics, 28.01.2020 05:31