subject
Mathematics, 03.01.2020 03:31 wavy419

Paul can install a 300-square-foot hardwood floor in 18 hours. matt can install the same floor in 22 hours. how long would it
take paul and matt to install the floor working together?
o
o
o
o
4 hours
9.9 hours
13.2 hours
30 hours

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, nicolemaefahey
Need this asap if anyone can i would be very grateful. if you could show workings that would really
Answers: 1
image
Mathematics, 21.06.2019 18:00, reinaelane77
Ling listed all of the factors of a mystery number: 1,2,4,8,16,32 what is the mystery number?
Answers: 2
image
Mathematics, 21.06.2019 19:10, hannahbannana98
If i have 20$ and i gave 5$ away how much i got
Answers: 1
image
Mathematics, 21.06.2019 23:50, davfar334p47luq
Given δjkl : δxyz, find x. a)10 b)12 c)16 d)20
Answers: 2
You know the right answer?
Paul can install a 300-square-foot hardwood floor in 18 hours. matt can install the same floor in 22...

Questions in other subjects:

Konu
Mathematics, 21.07.2019 04:30
Konu
Mathematics, 21.07.2019 04:30