Tony stark wants to build a 100 meter high tower as quickly as possible. he has unlimited resources and an unlimited budget and is willing to spend any amount to get the job done.

he has chosen to build the tower with blocks that are 100 meters long and 100 meters wide, but only 1 meter tall. the blocks interlock on top and bottom (like legos). they cannot be stacked sideways.

using special lifters, putting one stack on top of another stack takes one week regardless of how high the stacks are. what is the shortest amount of time that it will take to build the tower?
your answer should be in weeks.

before you answer the question for a 100 meter high tower, let’s find the answer for a 5 meter high tower and a 10 meter high tower.
5 meter -
10 meter -
100 meter -

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, mariah9695
Module 10 coordinate proof using slope and distance answers is quadrilateral abcd a parallelogram? explain how you know.
Answers: 1
image
Mathematics, 21.06.2019 22:00, bobk1433
Mrs. avila is buying a wallpaper border to go on all of her kitchen walls. she wants to buy 5 extra feet of wallpaper border than she needs to be sure she has enough. she buys 55.5 feet of the border. the store owner selling the border uses the width of mrs. avila's kitchen to determine that the length of her kitchen must be 14.5 feet.
Answers: 2
image
Mathematics, 21.06.2019 22:30, dakotaadkins20
Find the area of the region that is inside r=3cos(theta) and outside r=2-cos(theta). sketch the curves.
Answers: 3
image
Mathematics, 22.06.2019 01:30, karsenbeau
Given are five observations for two variables, x and y. xi 1 2 3 4 5 yi 3 7 5 11 14 which of the following is a scatter diagrams accurately represents the data? what does the scatter diagram developed in part (a) indicate about the relationship between the two variables? try to approximate the relationship betwen x and y by drawing a straight line through the data. which of the following is a scatter diagrams accurately represents the data? develop the estimated regression equation by computing the values of b 0 and b 1 using equations (14.6) and (14.7) (to 1 decimal). = + x use the estimated regression equation to predict the value of y when x = 4 (to 1 decimal). =
Answers: 3
You know the right answer?
Tony stark wants to build a 100 meter high tower as quickly as possible. he has unlimited resources...

Questions in other subjects:

Konu
Mathematics, 04.02.2020 19:50
Konu
Mathematics, 04.02.2020 19:50
Konu
Mathematics, 04.02.2020 19:50