subject
Mathematics, 20.12.2019 03:31 aidenmanpig

Asupplier of instrument gauge clusters uses a kanban system to control material flow. the gauge cluster housings are transported five at a time. a fabrication centre produces approximately 10 gauges per hour. it takes approximately two hours for the housing to be replenished. due to variations in processing times, management has decided to keep 25 percent of the needed inventory as safety stock. how many kanban card sets are needed?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, 902coo
How many different triangles can be constructed with the angle measurements of 134° 10° and 36° ?
Answers: 3
image
Mathematics, 21.06.2019 21:20, Hazard970
If two angles of a triangle have equal measures and the third angle measures 90°, what are the angle measures of the triangle? a. 60°, 60°, 60° b. 45°, 90°, 90° c. 30°, 30°, 90° d. 45°, 45°, 90°
Answers: 2
image
Mathematics, 21.06.2019 21:40, kellyroy74
Drag the tiles to the correct boxes to complete the pairs. label each function. as even , odd, or neither.
Answers: 1
image
Mathematics, 21.06.2019 22:30, minnahelhoor
How do i find the missing angle measure in a polygon
Answers: 1
You know the right answer?
Asupplier of instrument gauge clusters uses a kanban system to control material flow. the gauge clus...

Questions in other subjects:

Konu
Mathematics, 09.06.2021 16:50
Konu
Mathematics, 09.06.2021 16:50