Mathematics, 17.12.2019 06:31 truthqmatic16
Aconstruction company is planning to bid on a building contract. the bid costs the company $1700. the probability that the bid is accepted is 1/4. if the bid is accepted, the company will make $16,800 minus the cost of the bid. find the expected value in this situation.
Answers: 1
Mathematics, 21.06.2019 21:00, venancialee8805
The perimeter of a rectangle is 42 inches. if the width of the rectangle is 6 inches, what is the length
Answers: 2
Mathematics, 21.06.2019 22:30, lekepius3715
Given the system of equations presented here: 2x + 4y = 14 4x + y = 20 which of the following actions creates an equivalent system such that, when combined with the other equation, one of the variables is eliminated? multiply the second equation by â’4 to get â’16x â’ 4y = â’80 multiply the second equation by â’1 to get â’4x â’ y = â’20 multiply the first equation by 2 to get 4x + 8y = 28 multiply the first equation by â’1 to get â’2x â’ 4y = â’14
Answers: 1
Mathematics, 21.06.2019 23:00, look26goingjbgy
Complete the conditional statement. if a + 2 < b + 3, then a < b b < a a – b < 1 a < b + 1
Answers: 3
Aconstruction company is planning to bid on a building contract. the bid costs the company $1700. th...
History, 30.11.2020 18:50
English, 30.11.2020 18:50
Mathematics, 30.11.2020 18:50
Mathematics, 30.11.2020 18:50