subject
Mathematics, 17.12.2019 06:31 truthqmatic16

Aconstruction company is planning to bid on a building contract. the bid costs the company $1700. the probability that the bid is accepted is 1/4. if the bid is accepted, the company will make $16,800 minus the cost of the bid. find the expected value in this situation.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:00, venancialee8805
The perimeter of a rectangle is 42 inches. if the width of the rectangle is 6 inches, what is the length
Answers: 2
image
Mathematics, 21.06.2019 22:30, lekepius3715
Given the system of equations presented here: 2x + 4y = 14 4x + y = 20 which of the following actions creates an equivalent system such that, when combined with the other equation, one of the variables is eliminated? multiply the second equation by â’4 to get â’16x â’ 4y = â’80 multiply the second equation by â’1 to get â’4x â’ y = â’20 multiply the first equation by 2 to get 4x + 8y = 28 multiply the first equation by â’1 to get â’2x â’ 4y = â’14
Answers: 1
image
Mathematics, 21.06.2019 23:00, look26goingjbgy
Complete the conditional statement. if a + 2 < b + 3, then a < b b < a a – b < 1 a < b + 1
Answers: 3
image
Mathematics, 21.06.2019 23:30, f13vsdbd
Select all expressions that are equivalent to 2(3x + 7y). question 1 options: 6x + 14y 6x + 7y 1(6x + 14y)
Answers: 3
You know the right answer?
Aconstruction company is planning to bid on a building contract. the bid costs the company $1700. th...

Questions in other subjects:

Konu
History, 30.11.2020 18:50
Konu
English, 30.11.2020 18:50
Konu
Mathematics, 30.11.2020 18:50
Konu
Mathematics, 30.11.2020 18:50