Ann has 30 jobs that she must do in sequence, with the times required to do each of these jobs being independent random variables with mean 50 minutes and standard deviation 10 minutes. bob has 30 jobs that he must do in sequence, with the times required to do each of these jobs being independent random variables with mean 52 minutes and standard deviation 15 minutes. ann's and bob's times are:

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:40, JessicaSontay8841
Follow these steps using the algebra tiles to solve the equation −5x + (−2) = −2x + 4. 1. add 5 positive x-tiles to both sides and create zero pairs. 2. add 4 negative unit tiles to both sides and create zero pairs. 3. divide the unit tiles evenly among the x-tiles. x =
Answers: 2
image
Mathematics, 21.06.2019 19:00, kaylaamberd
What is the expression in factored form? -x^2 + 3x + 28 a. (x-7)(x-4) b. -(x-7)(x+4) c. (x+4)(x+7) d. -(x-4)(x+7)
Answers: 2
image
Mathematics, 21.06.2019 19:30, vanessagallion
Evaluate 3(a + b + c)squared for a = 2, b = 3, and c = 4. a. 54 b. 243 c.729 add solution .
Answers: 1
image
Mathematics, 22.06.2019 01:00, jayc36809
Sioux co. replaced the roof on its existing building, therefore increasing the building's life by 10 years. the cost of the roof is considered a(n):
Answers: 3
You know the right answer?
Ann has 30 jobs that she must do in sequence, with the times required to do each of these jobs being...

Questions in other subjects:

Konu
Mathematics, 29.07.2020 19:01
Konu
Mathematics, 29.07.2020 19:01