subject
Mathematics, 11.12.2019 08:31 Terrilady5

Aconstruction company now wants to build a 100 meter high tower as quickly as possible. the company has unlimited resources and an unlimited budget and is willing to spend any amount to get the job done.

the tower is to be built with blocks that are 5 meters long and 1 meters wide, but only 1 meter tall. the blocks interlock on top and bottom (like legos).

they cannot be stacked sideways. using special lifters, putting one stack on top of another stack takes one week regardless of how high the stacks are.

what is the shortest amount of time that it will take to build the tower?


Aconstruction company now wants to build a 100 meter high tower as quickly as possible. the company

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:30, h2o12
Marie drew the triangle shown. she wants to draw a second triangle that is different from this one. use the drop-down menus below to complete the statements about the second triangle.
Answers: 1
image
Mathematics, 21.06.2019 12:50, Chartwig4576
Which is the most efficient first step to solve x in the equation 3.7x - 18 = -4.3x -34 a. add 3.7x to both sides of the equation. b. add 4.3x to both sides of the equation. c. subtract 18 from both sides of the equation. d. subtract 34 from both sides of the equation.
Answers: 3
image
Mathematics, 21.06.2019 17:30, laurielaparr2930
X-intercept=-5 y-intercept=2 the equation of the line is
Answers: 2
image
Mathematics, 21.06.2019 18:30, leannhb3162
The bake stars picked 907 apples last weekend at a local orchard they made caramel apples and sold them in the bakery in trays of 6
Answers: 1
You know the right answer?
Aconstruction company now wants to build a 100 meter high tower as quickly as possible. the company...