Mcphee company manufactures rugs in the cutting and assembly process. rugs are manufactured in 70-rug batch sizes. the cutting time is 14 minutes per rug. the assembly time is 24 minutes per rug. it takes 18 minutes to move a batch of rugs from cutting to assembly. what is the value-added lead time?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:40, cifjdhhfdu
Aregular hexagon has sides of 2 feet. what is the area of the hexagon? 12 ft2 12 ft2 24 ft2 6 ft2
Answers: 2
image
Mathematics, 21.06.2019 19:30, santileiva123199
Factor the following expression. 27y3 – 343 a. (3y + 7)(9y2 + 2ly + 49) b. (3y – 7)(9y2 + 2ly + 49) c. (3y – 7)(932 – 217 + 49) d. (3y + 7)(92 – 2ly + 49)
Answers: 1
image
Mathematics, 21.06.2019 20:30, erikloza12pdidtx
Jose is going to use a random number generator 500500 times. each time he uses it, he will get a 1, 2, 3,1,2,3, or 44.
Answers: 1
image
Mathematics, 22.06.2019 00:50, meganwintergirl
4. a single woman uses an online cash flow calculator which reveals a cash flow of 203. what does this mean?
Answers: 3
You know the right answer?
Mcphee company manufactures rugs in the cutting and assembly process. rugs are manufactured in 70-ru...

Questions in other subjects: