Mathematics, 27.11.2019 01:31 rebeccacruzz2017
During the next three months, shoemaker, inc. must meet the following demands for shoes:
month 1, 1000 pairs; month 2, 1500 pairs; month 3, 1800 pairs. it takes 1 hour of labor to produce a pair of
shoes. during each of the next three months, the following number of regular-time labor hours are available:
month 1, 1000 hours, month 2, 1200 hours, month 3, 1200 hours. each month, the company can require
workers to put in up to 400 hours of overtime. workers are paid only for the hours they work, and a worker
receives $4 per hour for regular-time work and $6 per hour for overtime work. at the end of each month,
a holding cost of $1.5 per pair of shoes in incurred. formulate a min-cost network ow problem (mcnfp)
that can be used to minimize the total cost incurred in meeting the demand of the next three months. a
formulation requires drawing the appropriate network and determining the cij 's, uij 's, bi 's. how would you
modify your answer if demand could be backlogged (all demand must still be met by the end of month 3) at
a cost of $20/pair/month?
Answers: 3
Mathematics, 20.06.2019 18:02, erinwebsterrr
The total number of students in gina’s after-school program is .the number of students who have 4 or more siblings is .reset next
Answers: 2
During the next three months, shoemaker, inc. must meet the following demands for shoes:
History, 13.05.2021 05:30
History, 13.05.2021 05:30
English, 13.05.2021 05:30
Mathematics, 13.05.2021 05:30
Spanish, 13.05.2021 05:30