Mathematics, 22.11.2019 00:31 sonyfan
Asolar energy project is expected to have capital costs of $995,000, average yearly operating costs of $175,000, and a lifetime of 25 years. if the total production during the lifetime of the project is 89,500,000 kwh, what is the levelized cost of energy (lcoe)? (lcoe= capital costs + average yearly operating costs x number of project years / total production) ( am getting .327 which is not an option.)
a. $0.60 per kwh
b. $0.77 per kwh
c. 0.06 per kwh
d. $0.07 per kwh
Answers: 2
Mathematics, 21.06.2019 15:10, blessing5266
Aline on the wall and a line on the floor are skew. always, sometimes, or never?
Answers: 3
Mathematics, 21.06.2019 21:20, caseypearson377
Sam is a waiter at a local restaurant where he earns wages of $5 per hour sam figures that he also eams about $3 in tips for each person he serves sam works 6 hours on a particular day. if n represents the number of people sam serves that day, which of the following functions could sam use to figure ehis total earings for the do o a. en) = 30 o b. en) = 5n+ 18
Answers: 2
Mathematics, 21.06.2019 21:50, zymikaa00
Scores on a university exam are normally distributed with a mean of 78 and a standard deviation of 8. the professor teaching the class declares that a score of 70 or higher is required for a grade of at least “c.” using the 68-95-99.7 rule, what percentage of students failed to earn a grade of at least “c”?
Answers: 1
Mathematics, 21.06.2019 23:00, kedjenpierrelouis
Qrst is a parallelogram. determine the measure of ∠q pls
Answers: 2
Asolar energy project is expected to have capital costs of $995,000, average yearly operating costs...
History, 26.03.2020 03:35
History, 26.03.2020 03:35
Mathematics, 26.03.2020 03:35
Mathematics, 26.03.2020 03:35
Mathematics, 26.03.2020 03:35
Mathematics, 26.03.2020 03:36