subject
Mathematics, 18.11.2019 17:31 Science2019

1. at a local manufacturing plant, employees must complete new machine set ups within 30 minutes. new machine set-up times can be described by a normal model with a mean of 22 minutes and a standard deviation of four minutes.(a) what percent of new machine set ups take more than 30 minutes? (b) the typical worker needs ve minutes to adjust to their surroundings before beginning their duties. what percent of new machine set ups are completed within 25 minutes to allow for this?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:30, drandbone92
What is fraction that is equivalent to 3/8
Answers: 2
image
Mathematics, 22.06.2019 02:30, loveeegabbie7071
An incoming airplane is x miles due north from the control tower at an airport. a second incoming airplane is y miles due east of the same control tower. the shortest distance between the two airplanes is z miles. which of the following functions would best model the situation above?
Answers: 1
image
Mathematics, 22.06.2019 02:30, Jasten
Aline passes through the points (5,4) and (2.1). part a.) what is the slope of the line that passes through these points? show work. part b.) what is the equation of the line that passes through these points. show work. part c.) where does the line intercept on the x& y axis? show work
Answers: 1
image
Mathematics, 22.06.2019 03:30, kaperry
Find the volume v of the solid obtained by rotating the region bounded by the given curves about the specified line. y = x â’ 1 , y = 0, x = 5; about the x-axis v = sketch the region. sketch the solid, and a typical disk or washer.
Answers: 1
You know the right answer?
1. at a local manufacturing plant, employees must complete new machine set ups within 30 minutes. ne...

Questions in other subjects: