All the members of a construction crew work at the same pace. six of them working together are able to pour foundation in 22 hours.

how many hours will this job take if the number of workers increased by a factor of 4?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, cjd1214812148
The rectangle on the right is the image of the rectangle on the left. what transformation would result in this image? reflection rotation translation dilation
Answers: 2
image
Mathematics, 21.06.2019 22:30, jaydenrenee111902
The volume of the sun is approximately 1 × 10^18 cu km, while the volume of jupiter is approximately 1 × 10^15 cu km. which of the following is true? a. the volume of jupiter is approximately one thousand times the volume of the sun. b. the volume of jupiter is approximately one hundred times the volume of the sun. c. the volume of the sun is approximately one thousand times the volume of jupiter. d. the volume of the sun is approximately one hundred times the volume of jupiter.
Answers: 2
image
Mathematics, 21.06.2019 23:10, robert7248
Aline has a slope of . which ordered pairs could be points on a parallel line? check all that apply. (-8, 8) and (2, 2) (-5, -1) and (0, 2) (-3, 6) and (6, -9) (-2, 1) and (3,-2) (0, 2) and (5,5)
Answers: 3
image
Mathematics, 22.06.2019 03:30, alyssahockett4
Is a triangle with sides of length 6ft, 21 ft, 23 ft. a right triangle?
Answers: 1
You know the right answer?
All the members of a construction crew work at the same pace. six of them working together are able...

Questions in other subjects: