subject
Mathematics, 12.11.2019 20:31 chels6058

One of the hazards to an existing underground pipeline is due to improperly conducted excavations. consider a systemconsisting of 100 miles of pipeline. suppose the number of excavations along this pipeline over the next year follows apoisson process with a mean rate of 1 per 50 miles. forty percent of the excavations are expected to result in damage tothe pipeline. assume the events of damage between excavations are statistically independent.(a) what is the probability that there will be at least two excavations along the pipeline next year? (b) suppose that two excavations will be performed. what is the probability that the pipeline will be damaged? (c) what is the probability that the pipeline will not be damaged from excavations next year?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, coolkid20034
Need on this geometry question. explain how you did it.
Answers: 1
image
Mathematics, 21.06.2019 18:00, BeautyxQueen
John read the first 114 pages of a novel, which was 3 pages less than 1/3 of the novel. write an equation to determine the total number of pages (p)(p) in the novel.
Answers: 1
image
Mathematics, 21.06.2019 21:00, kprincess16r
Choose the equation below that represents the line that passes through the point (2, 4) and has a slope of 3. a) y − 4 = 3(x − 2) b) y − 2 = 3(x − 4) c) y + 4 = 3(x + 2) d) y + 2 = 3(x + 4)
Answers: 1
image
Mathematics, 21.06.2019 21:50, spookymod8967
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 3
You know the right answer?
One of the hazards to an existing underground pipeline is due to improperly conducted excavations. c...

Questions in other subjects:

Konu
Mathematics, 08.03.2021 20:40