subject
Mathematics, 08.11.2019 21:31 aesmithswhs

Formulate but do not solve the following exercise as a linear programming problem. a company manufactures x units of product a and y units of product b, on two machines, i and ii. it has been determined that the company will realize a profit of $2 on each unit of product a and $4 on each unit of product b. to manufacture a unit of product a requires 7 min on machine i and 3 min on machine ii. to manufacture a unit of product b requires 9 min on machine i and 3 min on machine ii. there are 154 min available on machine i and 66 min available on machine ii in each work shift. how many units of a product should be produced in each shift to maximize the company's profit p? p = subject to the constraints. machine i ii = 0 = 0

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, hwhite41
Diana is painting statues she has 7/8 of a liter of paint each statue requires 1/20 of a liter of paint how many statues can she paint?
Answers: 3
image
Mathematics, 21.06.2019 17:00, beautycutieforever10
Evaluate the expression for the given value of the variable. 5×(h+3) for h=7
Answers: 1
image
Mathematics, 21.06.2019 22:00, Thejollyhellhound20
The sum of the speeds of two trains is 720.2 mph. if the speed of the first train is 7.8 mph faster than the second train, find the speeds of each.
Answers: 1
image
Mathematics, 21.06.2019 23:30, lakeshia8880
At your job you're paid $50 per week plus $3 per sale at least how many saled do you need to make in order to have over $250
Answers: 1
You know the right answer?
Formulate but do not solve the following exercise as a linear programming problem. a company manufac...

Questions in other subjects:

Konu
Computers and Technology, 21.01.2021 20:30