Mathematics, 08.11.2019 05:31 Nigward666
Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours in the assembly department, and 2760 in the finishing department. manufacturing a chair requires 0.9 hour of cutting, 0.6 hour of assembly, and 0.5 hour of finishing. a cabinet requires 0.2 hour of cutting, 0.8 hour of assembly, and 0.6 hour of finishing. a buffet requires 0.4 hour of cutting, 0.5 hour of assembly, and 0.3 hour of finishing. how many chairs, cabinets, and buffets should be produced in order to use all the available production capacity?
Answers: 1
Mathematics, 21.06.2019 16:30, charitysamuels
What is the equation of a vertical line passing through the point (−5, −1)? y = −5 y = −1 x = −5 x = −1
Answers: 2
Mathematics, 21.06.2019 18:30, kenzie9493
Write a polynomial function f of least degree that has rational coefficients, a leading coefficient of 1, and the given zeros. 3, 4+2i, 1+(sqrt)7 the answer is supposed to be: f(x)=x(^5)-13x(^4)+60x(^3)-82x(^2)- 144x+360 what am i doing wrong?
Answers: 1
Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours...
History, 13.02.2020 20:00
Mathematics, 13.02.2020 20:00