subject
Mathematics, 08.11.2019 05:31 Nigward666

Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours in the assembly department, and 2760 in the finishing department. manufacturing a chair requires 0.9 hour of cutting, 0.6 hour of assembly, and 0.5 hour of finishing. a cabinet requires 0.2 hour of cutting, 0.8 hour of assembly, and 0.6 hour of finishing. a buffet requires 0.4 hour of cutting, 0.5 hour of assembly, and 0.3 hour of finishing. how many chairs, cabinets, and buffets should be produced in order to use all the available production capacity?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, charitysamuels
What is the equation of a vertical line passing through the point (−5, −1)? y = −5 y = −1 x = −5 x = −1
Answers: 2
image
Mathematics, 21.06.2019 17:30, bella51032
If f(x)=3x+1 and f^-1=x-1/3, then f^-1(7)=
Answers: 1
image
Mathematics, 21.06.2019 17:30, jjmo
25 ! the line of best fit is h = 5a + 86. predict the height at age 16.
Answers: 2
image
Mathematics, 21.06.2019 18:30, kenzie9493
Write a polynomial function f of least degree that has rational coefficients, a leading coefficient of 1, and the given zeros. 3, 4+2i, 1+(sqrt)7 the answer is supposed to be: f(x)=x(^5)-13x(^4)+60x(^3)-82x(^2)- 144x+360 what am i doing wrong?
Answers: 1
You know the right answer?
Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours...

Questions in other subjects:

Konu
History, 13.02.2020 20:00
Konu
Mathematics, 13.02.2020 20:00