An excavation company has been contracted to supply 10 million cubic feet (cu. ft.) of dirt to a construction site. the company uses a bulldozer to collect dirt, which is then moved to by dump truck to the construction site. it costs the company $100 per hour to use the bulldozer, and it rents dump trucks at a rate of $40 per hour per truck. each dump truck can hold 1,000 cu. ft. of dirt, and it takes an average of 12 minutes for the bulldozer to load a dump truck with dirt. it takes an average of five minutes for a fully loaded dump truck to deliver the dirt to the construction site and returns to the bulldozer for another load. assuming that the time to load a dump truck and the time for a dump truck to deliver the dirt to the construction site and return to the bulldozer follow exponential distributions, determine the most appropriate queuing model for the dirt-moving process and then use that model to determine how many dump trucks to rent in order to minimize the expected cost of fulfilling the contract.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, ejcastilllo
Let the mean of the population be 38 instances of from 6" - 9" hatchings per nest, and let the standard deviation of the mean be 3. what sample mean would have a confidence level of 95% or a 2.5% margin of error?
Answers: 1
image
Mathematics, 21.06.2019 22:00, alexisgonzales4752
Find an bif a = {3, 6, 9, 12) and b = {2, 4, 6, 8, 10).
Answers: 1
image
Mathematics, 22.06.2019 00:30, jayline2003
y=2x−1 5x−4y=1 is (1,1)(1,1) a solution of the system?
Answers: 1
image
Mathematics, 22.06.2019 01:10, Yailynn598
You work in a hospital that has 9 floors. you need to see 3 patients on each floor. how many patients do you need to see in all?
Answers: 2
You know the right answer?
An excavation company has been contracted to supply 10 million cubic feet (cu. ft.) of dirt to a con...

Questions in other subjects: