Mathematics, 02.11.2019 05:31 tblynch21
As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina and a binder) are tested for purity. the process requires that the purity of the alumina be greater than 85%. a random sample from a recent shipment of alumina yielded the following results (in percent):
93.2 87.0 92.1 90.1 87.3 93.6
a hypothesis test will be done to determine whethe or not to accept the shipment.
(a) state the appropriate null and alternate hypotheses.
(b) compute the p-value.
(c) should the shipment be accepted? explain.
Answers: 3
Mathematics, 21.06.2019 17:30, leslcookie23
During a bike challenge riders have to collect various colored ribbons each 1/2 mile they collect a red ribbon each eighth mile they collect a green ribbon and each quarter mile they collect a blue ribbion wich colors of ribion will be collected at the 3/4 markrer
Answers: 3
Mathematics, 21.06.2019 17:50, kayleewoodard
Eric has challenged himself to walk 24,000 steps in 4 days. if eric walks the same number of steps each day, which function represents the number of steps eric still needs to walk to reach his goal with respect to the number of days since he started his challenge? a. y = 8,000x − 24,000 b. y = -8,000x + 24,000 c. y = 6,000x − 24,000 d. y = -6,000x + 24,000
Answers: 1
Mathematics, 21.06.2019 22:20, guesswhoitis21
Line segment eg is partitioned by point f in the ratio 1: 1. point e is at e (0, 4), and point f is at (1, 3). what are the coordinates of point g? (−1, 5) (2, 2) (3, 1) (4, 0)
Answers: 2
As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina...
English, 30.10.2020 15:40
English, 30.10.2020 15:40
Social Studies, 30.10.2020 15:40
History, 30.10.2020 15:40
History, 30.10.2020 15:40