subject
Mathematics, 30.10.2019 04:31 ajames2182

Aproduction line is to be designed to assemble a product. the assembly of this product requires three tasks, one of which requires 0.3 minutes to complete, one of which requires 1.4 minutes to complete, and one of which requires 0.7 minutes to complete. what is the minimum possible cycle time of this assembly line? what is the maximum possible cycle time of this assembly line?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, evalentine843
Write the expression in simplified radical form. show all steps and work including any foil method work. (hint: use the conjugate. no decimal answers.) (9-2√3)/(12+√3)
Answers: 1
image
Mathematics, 21.06.2019 16:00, kissesforlester7097
Given right triangle xyz, which correctly describes the locations of the sides in relation to
Answers: 1
image
Mathematics, 21.06.2019 16:00, bailey1025
5× 1/2 = ? a) more than 5 because you are multiplying by a whole number b) 5/10 because you multiply the numerator and denominator by 5 c) less than 5 because you are multiplying by a number that is more than 1 d) less than 5 because you are multiplying by a number that is less than 1
Answers: 3
image
Mathematics, 21.06.2019 17:50, beard6488
Adriana sold 50 shares of a company’s stock through a broker. the price per share on that day was $22.98. the broker charged her a 0.75% commission. what was adriana’s real return after deducting the broker’s commission? a. $8.62 b. $229.80 c. $1,140.38 d. $1,149.00
Answers: 1
You know the right answer?
Aproduction line is to be designed to assemble a product. the assembly of this product requires thre...

Questions in other subjects:

Konu
Computers and Technology, 22.03.2021 14:00
Konu
Mathematics, 22.03.2021 14:00