Exercises problems for structural engineering 1. when estimating the live load for a new bridge design, you want that estimate to be conservative. in other words, you want to err on the safe side by basing the estimate on the worst possible scenario, such as bumper-to-bumper traffic, the heaviest vehicles, or the worst environmental conditions. with this in mind, estimate the live load for the following proposed bridge designs.
a. a foot bridge with a 174. ft span and two separate 4. ft wide lanes to allow for pedestrian traffic in both directions.
b. a four-lane highway bridge with a 300. ft span.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 00:30, angelyce4142
How can you check that you have correctly converted frequencies to relative frequencies?
Answers: 1
image
Mathematics, 22.06.2019 01:00, fendyli6066
Find the value of the variable and the length of each chord for #5 and #6.
Answers: 1
image
Mathematics, 22.06.2019 01:00, klysse123
During each minute of a comedy show, carlin laughs 55 times. carlin watches 33 comedy shows every day, and each show is 40 minutes long. how many times does carlin laugh every day due to the comedy shows?
Answers: 1
image
Mathematics, 22.06.2019 02:30, caprisun6779
Abby is collecting rainfall data. she finds that one value of the data set is a high-value outlier. which statement must be true? abby will use a different formula for calculating the standard deviation. the outlier will increase the standard deviation of the data set. the spread of the graph of the data will not change. abby will not use the mean when calculating the standard deviation.
Answers: 3
You know the right answer?
Exercises problems for structural engineering 1. when estimating the live load for a new bridge desi...