subject
Mathematics, 18.10.2019 03:30 juliannabartra

Applied linear algebraa manufacturer produces desks and bookcases. desks d require 5 hours of cutting time and 10 hours of assembling time. bookcases b require 15 minutes of cutting time and one hour of assembling time. each day, the manufacturer has available 200 hours for cutting and 500 hours for assembling. the manufacturer wants to know how many desks and bookcases should be scheduled for completion each day to utilize all available work power. show that this problem is equivelent to solving two equatinos in the two unknowns d and b.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, tporter00
Write the fraction or mixed number and the decimal shown by the model
Answers: 2
image
Mathematics, 21.06.2019 19:50, nawafcanada
On a piece of paper graft y+2> -3x-3 then determine which answer matches the graph you drew
Answers: 2
image
Mathematics, 21.06.2019 23:30, miko96
Identify the slope an intercept of the following linear equation y = 1/5x - 6 a. slope: 1/5; intercept: -6 b. slope: 5; intercept: -6 c. slope: -1/5; intercept: 6 d. slope: 1/5; intercept: 6
Answers: 2
image
Mathematics, 22.06.2019 00:50, Pmedellin27
Acube has a volume of 800 cubic inches. whatis the length of an edge of the cube, in inches? a. 23/100b. 43/50c. 83/100d. 1003/2e. 1003/8
Answers: 2
You know the right answer?
Applied linear algebraa manufacturer produces desks and bookcases. desks d require 5 hours of cuttin...

Questions in other subjects:

Konu
World Languages, 07.10.2020 01:01
Konu
English, 07.10.2020 01:01
Konu
Social Studies, 07.10.2020 01:01
Konu
Social Studies, 07.10.2020 01:01