Aproduction line has three machines a, b, and c, with reliabilities of .99, .96, and .93,respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line (i. e., a series backup), and plan 2 involves providing a backup for each machine (i. e., a parallel backup). in either case, three additional machines (a, b, and c) would be used with reliabilities equal to the original three.

a. which plan will provide higher reliability?
b. explain why the two reliabilities are not the same.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, aperez4102
What is the order of magnitude for the number of liters in a large bottle of soda served at a party
Answers: 2
image
Mathematics, 21.06.2019 22:20, twentyonepilots12018
Which of the following equations are equivalent to -2m - 5m - 8 = 3 + (-7) + m? -15m = -4m -7m - 8 = m - 4 -3m - 8 = 4 - m m - 4 = -7m - 8 -8 - 7m = -4 + m -8 - 3m = 4 - m
Answers: 1
image
Mathematics, 22.06.2019 02:10, gabrielolivas59
Martha is training for a duathlon, which includes biking and running. she knows that yesterday she covered a total distance of over 55.5 miles in more than than 4.5 hours of training. martha runs at a speed of 6 mph and bikes at a rate of 15.5 mph.
Answers: 1
image
Mathematics, 22.06.2019 03:30, coolgirl5679
The half-life of a certain material is 0.002 second. approximately how much of a 14-gram sample will be left after 0.004 second? a. 12 grams b. 3.5 grams c. 0.06 gram d. 7 grams
Answers: 3
You know the right answer?
Aproduction line has three machines a, b, and c, with reliabilities of .99, .96, and .93,respectivel...

Questions in other subjects:

Konu
History, 09.12.2020 19:00