Mathematics, 16.10.2019 00:00 sindy35111
During finals week, students arrive randomly at the desk of the computer lab. there is only one technician due to budget cuts, and the time required to provide service varies from student to student. the average arrival rate is 15 students per hour, and the average service rate is 20 students per hour. assuming standard waiting line distribution parameters hold. the administration finally increases the budget for the computer lab after numerous student protests, and the lab hires another technician who works at the same rate as the first technician. what is the average waiting time per student with the 2 technicians working at the same time? assume the students form a single line at the desk, and continue to arrive at the average rate of 15/hr." 9 min 0.9 min 4.5 min impossible to tell without additional information
Answers: 1
Mathematics, 21.06.2019 13:00, nicolescaggs
There is a line with slope 1/a going through the point (a, a²). find the equation of the line perpendicular to this line at this point. (don’t let this problem intimidate you! solve the problem as you would if i’d given you specific values. just use variables instead.)
Answers: 2
Mathematics, 21.06.2019 22:30, gunnatvinson
If a line is defined by the equation y = 5x + 2, what is the slope?
Answers: 2
During finals week, students arrive randomly at the desk of the computer lab. there is only one tec...
Mathematics, 05.12.2020 07:20
English, 05.12.2020 07:20
Chemistry, 05.12.2020 07:20
Biology, 05.12.2020 07:20
English, 05.12.2020 07:20
Biology, 05.12.2020 07:20