subject
Mathematics, 08.10.2019 23:00 MayFlowers

Errors in estimating job costs. a construction company employs three sales engineers. engineers 1,2, and 3 estimated the costs of 30%, 20% and 50%, respectively, of all jobs bid on by the company. for i=1,2,3, define ei to be the event that a job is estimated by engineer i. the following probabilities describe the rates at which engineers make serious errors in estimating costs:
a) if a particular bid results in a serious error in estimating job cost, what is the probability that the error was made by engineer 1?
b) if a particular bid results in a serious error in estimating job cost, what is the probability that the error was made by engineer 2?
c) if a particular bid results in a serious error in estimating job cost, what is the probability that the error was made by engineer 3?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, skye2598
Plz need answer now will mark which situations represent linear functions? check all that apply. a)the temperature rises and falls over the course of a day. temperature is a function of time. b)a baseball is hit into the outfield. the height of the ball is a function of time. c)a car goes 55 mph on the highway. distance is a function of time. d)a child grew 2 inches this year and 1 inch last year. height is a function of time. e)a movie director makes 2 movies per year. the number of movies is a function of the years.
Answers: 3
image
Mathematics, 21.06.2019 15:50, tylerwayneparks
(08.01)consider the following pair of equations: x + y = −2 y = 2x + 10 if the two equations are graphed, at what point do the lines representing the two equations intersect? (−4, 2) (4, 2) (−2, 4) (2, 4)
Answers: 2
image
Mathematics, 21.06.2019 19:00, ellie4678
Me with geometry ! in this figure, bc is a perpendicular bisects of kj. dm is the angle bisects of bdj. what is the measure of bdm? •60° •90° •30° •45°
Answers: 2
image
Mathematics, 21.06.2019 19:10, AshyCakes
Can some one me with these questions
Answers: 2
You know the right answer?
Errors in estimating job costs. a construction company employs three sales engineers. engineers 1,2,...

Questions in other subjects:

Konu
Biology, 05.11.2020 07:10
Konu
English, 05.11.2020 07:10
Konu
Mathematics, 05.11.2020 07:10
Konu
Mathematics, 05.11.2020 07:10
Konu
Mathematics, 05.11.2020 07:10