Mathematics, 02.10.2019 22:20 itzking411
Amasonry contractor is preparing an estimate for building a stone wall and gate. he estimates that the job will take a 40-hour work week. he plans to have two laborers at $10 per hour and six masons at $21 per hour. he'll need $3337 worth of materials and wishes to make a profit of $400. write a mathematical statement that will give the estimated cost of the job. then calculate this total.
Answers: 1
Mathematics, 22.06.2019 00:30, kadinmorgan
The value, v, of kalani’s stock investments over a time period, x, can be determined using the equation v=750(0.80)^-x. what is the rate of increase or decrease associated with this account? 20% decrease 20% increase 25% decrease 25% increase
Answers: 1
Mathematics, 22.06.2019 04:00, skaterwolf1317
Ms. aniston asked seven students in her class to collect pet food cans for a local animal shelter. the dot plot shows the number of food cans collected by each student. each dot represents one student. what is the median of the data set? a. 6 b. 9 c. 7 d. 8
Answers: 1
Mathematics, 22.06.2019 06:00, lakenyahar
Robert is replacing sod in two square shaped areas of his backyard. one side of the first area is 7.5 feet. one side of the other is 5.7 feet. the sod costs y dollars per square foot.
Answers: 2
Amasonry contractor is preparing an estimate for building a stone wall and gate. he estimates that t...
Biology, 11.07.2019 06:30
English, 11.07.2019 06:30
Biology, 11.07.2019 06:30
History, 11.07.2019 06:30
Business, 11.07.2019 06:30
History, 11.07.2019 06:30
Mathematics, 11.07.2019 06:30